Acid Bath: a three-machine sprint of a 500 m ski, 500 m row and 1,000 m BikeErg for time. Target: about 5–6 minutes.
For Time
- 500 m Ski
- 500 m Row
- 1,000 m BikeErg
Score is your total time.
Warm-Up
Plan on about 25–30 minutes. Move through each part in order; the last part is a short rehearsal at workout pace. Tap any underlined movement to watch a demo.
Warm-Up
Move through at a comfortable pace
- 500 m Ski
- 500 m Row
- 1,000 m BikeErg
Movement Prep
Move through
- 30s Couch Stretch / side
- 30s Flat-Back Forward Fold
- 30s Banded Lat Stretch / side
- 30s Seal Stretch
Rehearsal
EMOM 9:00: 20s on an erg
- Minutes 1–3: Ski
- Minutes 4–6: Row
- Minutes 7–9: Bike
Hold a split a few seconds faster than your projected workout pace.
Rest to Recovery, Then Go Get It!
Pacing by Ability
Acid Bath has no scaled version. Everyone does the same 500 m ski, 500 m row and 1,000 m BikeErg. You make it fit your ability by choosing the right pace, not by cutting the distances.
- Use your 1K and 2K times: each piece lasts about as long as a 1,500 m effort (the BikeErg covers twice the distance, so it takes about the same time). If you know your times, aim between your 1K and 2K pace on each machine, a little quicker than 2K.
- Less experience at high intensity on these machines? Aim for about your 2K pace, or just slower, instead of chasing 1K pace. Holding a steady split beats blowing up on the first machine.
- Ski: don’t overcook it. The ski is the easiest place to keep pulling hard, but that fatigue carries straight into the row.
- Row: expect it to be the hardest to hold. Coming off the ski, many athletes end up a bit slower than their 2K pace here. Plan for that rather than panicking.
- Bike: empty the tank. Your legs are tired overall but not locally fried, so you can still push hard. Set the damper before the clock starts so you aren’t reaching down to adjust it mid-piece.
Intent
Acid Bath is a three-machine sprint. Each piece is short, but the transitions stack the burn: it’s about how well you hold pace while your legs and lungs fill up.
- What it tests: anaerobic power and machine pacing
- Target: about 5–6 minutes
- Who it’s for: everyone. The distances never change; your pace is the scale.
Strategy
- Ski: fast, just under all-out.
- Row: the hardest part; hold your split.
- Bike: empty the tank.
Setup & Standards
- Equipment: SkiErg, rower and BikeErg set up side by side.
- Transitions: the clock runs through them.
Meet the ZOAR Fitness Team
Our Programming.
Tailor-Built for You.
45-minute 1-on-1 call
$75, credited to your first month
What’s included →
Acid Bath FAQ
What is the Acid Bath WOD?
Acid Bath: a three-machine sprint of a 500 m ski, 500 m row and 1,000 m BikeErg for time.
What is a good time for Acid Bath?
Target: about 5–6 minutes.
What does Acid Bath test?
Acid Bath tests anaerobic power and machine pacing.
How do I scale Acid Bath?
Acid Bath has no scaled version. Everyone does the same 500 m ski, 500 m row and 1,000 m BikeErg. You make it fit your ability by choosing the right pace, not by cutting the distances.




